Martin Luther King Jr. Memorial Park Playground Renovation

353 Court St, Rochester, NY 14607 – Manhattan Square

Client: City of Rochester, New York
Construction Completion: October 2026

Project Services: Civil Engineering, Land Survey, Stakeout, Infrastructure Assessment, Grading and Drainage Analysis, Water and Sanitary Sewer Evaluation, and Utility Coordination

About the MLK Park Playground Renovation

The renovated MLK Park playground in Rochester, NY officially opened on October 29, 2026. The City of Rochester and community partners marked the opening with a ribbon cutting. The playground sits within Martin Luther King Jr. Memorial Park at the corner of Manhattan Square Drive and Adventure Place, across from The Strong National Museum of Play. Costich Engineering provided civil engineering services for the project.

The City initiated the renovation as part of a long-term effort to modernize one of its most prominent downtown public spaces. The playground was last improved more than two decades earlier and had reached the end of its useful life. Aging infrastructure, non-operational features, and constrained site conditions created safety, accessibility, and visibility challenges.

Community groups and residents of all ages helped shape the design through input sessions and an advisory committee. As a result, the completed playground includes equipment accessible to people who use wheelchairs and to children of varying motor abilities. It also features sensory experiences, distinct play zones, and a splash pad.

The park is highly active, hosting year-round events and a seasonal ice rink. For this reason, the project required careful coordination to support increased public use while addressing underlying infrastructure needs. The playground renovation is one phase of a broader, multi-year investment in the park and the growing Neighborhood of Play in downtown Rochester.

Civil Engineering Services Provided by Costich

Costich Engineering provided civil engineering services supporting the planning and design of the playground renovation. Our focus was evaluating existing infrastructure and ensuring the site could safely accommodate renewed recreational use. This work included assessing existing grading and drainage conditions and reviewing stormwater management considerations. We also evaluated the condition and capacity of the water and sanitary sewer systems serving the park.

During early design phases, Costich provided civil engineering input to support schematic planning, utility coordination, and constructability within an established urban park. Our role emphasized aligning new recreational improvements with reliable infrastructure systems and long-term municipal maintenance needs.

Infrastructure Challenges in an Urban Park Setting

Urban park renovations require a clear understanding of how surface improvements interact with underground utilities, drainage patterns, and existing site constraints. Costich’s civil engineering work supported design decisions related to grading, drainage, and utility systems. These decisions help ensure safe circulation, effective stormwater management, and compatibility with surrounding park amenities.

In addition, the downtown setting and phased redevelopment of the park required coordination with City agencies. The design also considered long-term operational performance as the park continues to evolve.

An Inclusive Playground for Downtown Rochester

Public recreational spaces rely on dependable infrastructure to remain safe, accessible, and welcoming over time. Costich’s civil engineering services supported the City’s goal of renewing the playground by addressing site and utility conditions that directly affect public safety and usability. Now open, the playground gives children of all abilities a place to play side by side. It also offers families, visitors, and downtown residents a new reason to gather at MLK Park as its revitalization continues.

FAQ

The renovated playground at Martin Luther King Jr. Memorial Park opened on October 29, 2026, with a ribbon cutting led by the City of Rochester. It is located at 353 Court Street, at the corner of Manhattan Square Drive and Adventure Place.

Costich Engineering provided civil engineering services for the City of Rochester. The work included grading and drainage analysis, stormwater review, water and sanitary sewer evaluation, and utility coordination during planning and early design.

A playground renovation usually depends on what sits below grade, even when the visible work is new equipment and surfacing. Grading, drainage, stormwater management, and water and sewer connections all need evaluation. This keeps the new play space draining properly, accessible, and compatible with existing park infrastructure.

Accessible routes and play surfaces need to stay level, firm, and stable. Poor drainage causes standing water, settlement, and surface damage that create tripping hazards and barriers for wheelchair users. Grading that moves water away from play areas and walkways protects both accessibility and the life of the surfacing.

The playground includes equipment accessible to people who use wheelchairs and to children of varying motor abilities, along with sensory experiences, distinct play zones, and a spray feature. Its design was shaped by community input sessions and an advisory committee organized by the City of Rochester.

Gallery

Additional Information

Learn more about the park, its hours, and amenities by going to the City of Rochester website:
https://www.cityofrochester.gov/MLKpark

Learn more about the playground’s community input and design process by going to the City of Rochester project page:
https://cityofrochester.gov/mlkparkrenovation

Read the City’s announcement of the playground opening on the Minority Reporter website:
https://www.minorityreporter.net/post/new-mlk-park-playground-provides-accessible-inclusive-play-destination-for-families

See photos from the October 29 ribbon cutting on the 13WHAM website:
https://13wham.com/news/local/gallery-new-playground-opens-at-mlk-park-in-downtown-rochester-martin-luther-king-jr-manhattan-square-strong-national-museum-of-play

Learn more about the history of MLK Park’s multi-year renovation on the WXXI News website:
https://www.wxxinews.org/local-news/2025-02-19/after-nearly-23-years-mlk-park-renovations-near-completion