Thornell Road Monopine

Thornell Road Monopine

Pittsford, NY 

 

Client: Verizon Wireless, 1275 John Street – Suite 100, West Henrietta, NY 14586
Construction Completion: Fall 2023

Project Services: Land Survey (topography, boundary, construction stakeout and as-built mapping), Landscape Architecture, Civil Engineering, Zoning Drawings, Environmental and Visual Assessments w/Exhibits, Photo Simulations, Utility Design, Construction Drawings and Administration

Project Background

Blending Technology with the Landscape: Thornell Road Monopine in Pittsford, NY
The Thornell Road project showcases how careful engineering and thoughtful design can integrate modern infrastructure into a sensitive community setting. This 105-foot monopine wireless telecommunications facility was designed to deliver reliable service while maintaining the visual integrity of the surrounding neighborhood.

Collaborative Design and Approval Process
Working in close partnership with Verizon Wireless, our design team, and the client’s legal representatives, Costich Engineering prepared comprehensive site development and zoning materials to secure approvals. This included detailed surveys, visual assessments, and photo simulations to demonstrate how the monopine would minimize aesthetic impacts on the community.

Engineering and Technical Services
Our team provided a full range of services, including topographic and boundary surveys, site layout, utility design, and civil engineering plans. Construction stakeout and as-built mapping ensured accuracy from design through project completion. Landscape architecture services further enhanced the project’s ability to blend with its surroundings.

Balancing Community and Connectivity
Through thoughtful planning and strategic design, the Thornell Road Monopine facility meets modern wireless needs while respecting community character. By selecting a monopine structure, the tower integrates into the existing treescape and reduces visual disruption, providing long-term benefits for both residents and network users.

Key Features

  • 105-foot monopine telecommunications tower

  • Topographic, boundary, and construction surveys with as-built mapping

  • Comprehensive zoning drawings, environmental and visual assessments

  • Photo simulations to demonstrate minimal community impact

  • Civil engineering, utility design, and landscape architecture services

  • Construction documentation and administration from start to finish

 

Gallery

New York Beer Project Orchard Park, NY

NY Beer Project (Orchard Park, NY)

350 Winward Road, Orchard Park, NY 14127

Client: New York Beer Project / Genesee Construction Services
Construction Completion: 2024

Project Services: Land Survey, Civil Engineering, Landscape Architecture, Schematic Design, Design Development, Construction Documents/Permitting, Municipal Approvals & Construction Administration, SWPPP Inspections

Project Background

Brewing Community in Orchard Park: NY Beer Project Expansion
The NY Beer Project in Orchard Park brings together craft brewing, dining, and community space in a vibrant new facility. Situated on a 9.3-acre parcel in Sterling Business Park, this two-story, 32,000-square-foot building combines architectural character with functional design to support brewing operations and guest experiences.

Civil, Site, and Landscape Design
Costich Engineering partnered with the project team to deliver comprehensive surveying, civil engineering, and landscape architecture services. Our responsibilities included schematic design, site development plans, municipal approvals, and construction administration to ensure smooth coordination across all phases.

Creating a Destination
The facility will house brewing operations, a tasting room, and a full pub/restaurant on the first floor, while the second floor provides flexible event space. Exterior areas feature covered and uncovered patios, landscaped greenspaces, a fire pit, and pedestrian walkways—enhancing the customer experience and creating a regional destination.

Key Features

  • Two-story, 32,000-square-foot brewing and dining facility

  • Comprehensive site and landscape design services

  • Brewing operations, tasting room, pub/restaurant, and event space

  • Outdoor patios, landscaped greenspaces, and pedestrian amenities

  • Timber framing with stone accents and a standing seam roof

  • Full construction administration and municipal approval support

 

Drone Construction Photos

Credit to Genesee Construction for the Drone Construction Photos, August 2023

Construction Progress

COSTICH construction progress photos from September 1, 2023

Construction Nearing Completion

COSTICH construction completion photos from May 2, 2024

Additional Information

Wilkins RV (Junius, NY)

Wilkins RV (Junius, NY)

Client: Chrisanntha Construction Corp.
Construction Completion: March 2024

Project Services: Survey, Civil Engineering, Landscape Architecture, Municipal Approvals, Construction Documents/Permitting, Construction Administration, and SWPPP Inspections

Project Background

Driving Growth in Junius: Wilkins RV Development
The Wilkins RV project transformed a 35-acre vacant parcel along the New York State Thruway into a modern, full-service recreational vehicle facility. With direct access to Route 318, the site was designed to support both current operations and future business growth.

Comprehensive Site and Facility Design
Costich Engineering delivered surveying, civil engineering, and landscape architecture services, guiding the project from schematic planning through construction administration and inspections. Our team coordinated municipal approvals and agency permitting to ensure compliance at every step.

A State-of-the-Art RV Facility
The development features a 44,500-square-foot building that houses a showroom, parts department, service department, and office space. A 10,000-square-foot expansion area was master-planned to accommodate future growth. Supporting site infrastructure includes parking for customer, display, and service vehicles, a new access road to Route 318, stormwater management systems, lighting, landscaping, and utility connections.

Key Features

  • Development of 35 acres along NYS Thruway and Route 318

  • 44,500-square-foot showroom, service, and office facility

  • 10,000-square-foot master-planned expansion area

  • Parking for customer, display, and service vehicles

  • Access road with ingress/egress to Route 318

  • Stormwater management facilities and site lighting

  • Comprehensive landscaping and utility infrastructure

  • Full-service project management and municipal approvals

Construction Progress

Gallery

Additional Information

Kilbourn Place on East

Kilbourn Place on East

3540 East Avenue, Rochester, NY 14618

Client: Riedman Companies
Construction Completion: 2023

Project Services:  Land Survey, Civil Engineering, Landscape Architecture, Schematic Design, Design Development, Construction Documents/Permitting, Municipal Approvals & Construction Administration, SWPPP Inspections

Project Background

Kilbourn on East: Modern Living Along East Avenue
The Kilbourn on East development delivers a thoughtfully planned residential community in Rochester’s East Avenue corridor. Costich Engineering supported the project from its early planning stages in 2012 through final construction, providing survey, civil engineering, and landscape architecture services.

Long-Term Planning and Execution
Over more than a decade, our team guided the project through schematic design, site development, municipal approvals, and construction administration. This comprehensive approach ensured smooth coordination and timely delivery, aligning with community expectations and regional growth.

A New Residential Destination
The completed development features two apartment buildings, a townhome, and a carriage home, complemented by upgraded site infrastructure. Utilities, parking areas, and landscaping were designed to integrate seamlessly with the residential environment. A key milestone was completing construction in time to welcome visitors during the PGA tournament at nearby Oak Hill.

Key Features

  • Residential community along East Avenue in Rochester, NY

  • Two apartment buildings, one townhome, and one carriage home

  • Comprehensive survey, civil engineering, and landscape architecture services

  • Utilities, parking, and landscaping designed for long-term function

  • Multi-phase approvals and construction support since 2012

  • Project completed ahead of the 2023 PGA tournament at Oak Hill

Gallery

VanBortel Corvette (Macedon, NY)

VanBortel Corvette (Macedon, NY)

1338 Pittsford Palmyra Rd, Macedon, NY 14502

Client: Chrisanntha Construction Corp.
Construction Completion: 2023

Project Services: Land Survey, Civil Engineering, Landscape Architecture, Design Development, Construction Documents/Permitting, Municipal Approvals & Construction Administration, SWPPP Inspections

Project Background

VanBortel Corvette: A Modern Automotive Facility in Macedon
The VanBortel Corvette project brought a brand-new automotive facility to Macedon, NY, replacing the former structure on Pittsford Palmyra Road. Costich Engineering supported the redevelopment with surveying, civil engineering, and landscape architecture services to ensure a high-quality, functional design.

From Demolition to Redevelopment
Following the removal of the existing building, a new facility was constructed to house a showroom, service area, and dedicated car storage. Our team provided site design, utility coordination, and municipal approvals to move the project from planning through construction.

On-Site Oversight and Compliance
During active construction, Costich provided construction administration and SWPPP inspections to ensure compliance with environmental regulations and municipal requirements. Today, the project is complete, and the VanBortel Corvette facility is open to serve customers across the region.

Key Features

  • New automotive showroom, service area, and storage facility

  • Site design and municipal approvals delivered by Costich

  • Comprehensive land surveying, civil engineering, and landscape architecture

  • SWPPP inspections and construction oversight during build

Gallery

Verizon Wireless 5G Small Cell Utility Poles

Verizon Wireless - 5G Small Cell Utility Poles

Greece, NY

 

Client: Verizon Wireless
Construction Completion: 2021

Project Services: Land Survey, Civil Engineering, Schematic Design, Photosimulations, Visual Assessments, Construction Documentation

Project Background

Advancing Connectivity in Greece: 5G Small Cell Utility Poles
To support the rapid growth of wireless technology, Costich Engineering partnered with Verizon Wireless and the Town of Greece to design and implement 5G small cell infrastructure throughout the community. These installations enhance coverage and data transmission while blending seamlessly into existing streetscapes.

Smart Integration with Minimal Impact
Rather than introducing large new structures, antennas were strategically mounted on existing utility poles and streetlights. This approach delivers expanded 5G service with no negative environmental impact while maintaining the character of suburban neighborhoods.

Engineering and Design Support
Costich provided surveying, civil engineering, schematic design, visual assessments, and photo simulations, along with full construction documentation to guide implementation. Our comprehensive services ensured both technical accuracy and regulatory compliance.

Key Features

  • 5G antennas installed on existing utility poles and streetlights

  • Improved wireless coverage and data capacity in suburban areas

  • Minimal visual and environmental impact from installations

  • Comprehensive survey, engineering, and design services

  • Visual assessments and photo simulations for municipal review

Verizon Wireless Stealth Bell Tower

Verizon Wireless Stealth Bell Tower

Pittsford, NY

 

Client: Verizon Wireless
Construction Completion: Summer 2020

Project Services: Land Survey, Landscape Architecture, Civil Engineering, Zoning Drawings, Environmental and Visual Assessments, Utility Design, Construction Drawings

 

Project Background

Blending Technology with Tradition: Stealth Bell Tower in Pittsford
The Verizon Wireless Stealth Bell Tower project highlights how modern telecommunications infrastructure can be integrated into a historic village setting with minimal visual impact. Located in Pittsford, NY, this 80-foot wireless facility was designed to deliver enhanced cellular coverage while respecting community character.

Discreet Design Solutions
The antennas are concealed behind RF-transparent panels at the top of the tower, while equipment cabinets are hidden within faux brick walls at the base. This approach allows the structure to function as a modern telecommunications hub without disrupting the visual integrity of its surroundings.

Engineering and Planning Expertise
Costich Engineering provided comprehensive services including land surveying, civil engineering, landscape architecture, zoning drawings, utility design, and environmental and visual assessments. Our detailed construction drawings supported the permitting and build process from start to finish.

Key Features

  • 80-foot stealth wireless bell tower

  • RF-transparent panels conceal antennas at the tower’s top

  • Faux brick walls disguise base equipment cabinets

  • Enhanced cellular coverage for the Village of Pittsford

  • Full suite of surveying, engineering, and landscape architecture services

  • Environmental and visual assessments for municipal review

Gallery

Niagara Falls Boulevard Delta Sonic Car Wash

Delta Sonic

3100 Niagara Falls Blvd, Amherst, NY 14228

 

Client: Benderson Development
Construction Completion: 2022

Project Services: Land Survey, Landscape Architecture, Civil Engineering

 

Project Background

Delta Sonic Amherst: A Full-Service Car Care Destination
The Delta Sonic at 3100 Niagara Falls Boulevard in Amherst, NY, delivers a complete car care and convenience experience. The new 50,000-square-foot facility integrates fueling, service, and retail amenities into a single site designed for efficiency and customer accessibility.

Comprehensive Services and Amenities
The development includes a convenience store with a drive-thru, multiple fuel dispensers, oil change and repair bays, an indoor vacuum and detail shop, and a modern car wash. Internal connections link the site to adjacent businesses, strengthening the surrounding commercial network.

Engineering, Landscape, and Hardscape Design
Costich Engineering provided land surveying, civil engineering, and landscape architecture services for this multi-faceted project. Our team oversaw extensive landscape and hardscape improvements, along with wayfinding signage to enhance circulation and guide patrons to on-site amenities.

Key Features

  • 50,000-square-foot car wash and convenience facility

  • Fuel dispensers, oil and repair bays, and detailing services

  • Drive-thru convenience store with modern amenities

  • Indoor vacuums and customer service areas

  • Internal site connections to adjacent businesses

  • Landscape, hardscape, and wayfinding signage design

KanPak

KanPak

105 Horizon Park Drive, Penn Yan, NY 14527

 

Client: Chrisanntha Construction Corporation
Construction Completion: Summer 2021

Project Services: Land Survey, Landscape Architecture, Civil Engineering, Schematic Design, Design Development, Construction Documentation, Construction Observation and SWPPP inspection.

Project Background

KanPak: Supporting Growth in Aseptic Food Processing
What began as a 20,000-square-foot production facility has grown into a 250,000-square-foot aseptic processing and packaging operation in Penn Yan, NY. Costich Engineering has been a trusted partner since the facility’s inception in 2002, guiding multiple phases of expansion within the Horizon Park Drive Business Park, a Yates County IDA development area.

Comprehensive Engineering Services
Our team provided surveying, civil engineering, and landscape architecture services across every phase of development. From conceptual site designs to final construction documents, Costich delivered functional solutions for utilities, grading, erosion control, vehicular circulation, landscaping, and lighting. Each expansion required careful planning to support KanPak’s growth while maintaining efficient site operations.

Specialized Design Expertise
We prepared detailed engineer’s reports and designs for wastewater treatment systems, oil/water separators, and RPZ backflow prevention. Additional services included ALTA surveys, construction stakeout, observation, and SWPPP inspections. These elements ensured regulatory compliance and long-term functionality for the expanding facility.

A Long-Term Partnership
Over two decades of collaboration, Costich has helped KanPak transform into a leader in aseptic packaging. Today, the company operates 14 acres of office, processing, and warehouse space, reinforcing its national reputation for innovation and customer service.

Key Features

  • Multi-phase development of a 250,000-square-foot facility

  • Comprehensive surveying, engineering, and landscape architecture services

  • Site planning for utilities, grading, and circulation

  • Wastewater treatment, oil/water separator, and backflow prevention design

  • ALTA surveys, construction stakeout, and SWPPP inspections

  • Located in Yates County IDA’s Horizon Park Drive Business Park

Gallery

Additional Information

Check out the Costich time-lapse slide show of the construction process:

Check out the latest project cut sheet:

KanPak Project Cut Sheet

WA 30 Wickham Blvd & Greig Street (A Lake Ontario Resiliency and Economic Development REDI Project)

7264

WA 30 Wickham Blvd & Greig Street

A New York State Lake Ontario Resiliency and Economic Development (REDI) Project

Client: Village of Sodus Point, New York
Construction Completion: November 2021

Project Services: Land Survey, Landscape Architecture, Civil Engineering, Schematic Design, Design Development, Construction Documentation & Construction Observation

 

Project Background

Protecting Sodus Point: Flood Resilience Through REDI Funding
The WA 30 Wickham Boulevard and Greig Street project was developed to address the severe flooding that impacted the Village of Sodus Point in 2017 and 2019 due to rising Lake Ontario water levels. With grant funding from the New York State Lake Ontario Resiliency and Economic Development Initiative (REDI), Costich Engineering delivered multidisciplinary services to strengthen community resilience while maintaining access to businesses, residences, and waterfront amenities.

Survey, Engineering, and Design Services
Our land survey team provided the detailed boundary, topographic, and utility mapping necessary to guide design and permitting. Civil engineering efforts focused on expanding and upgrading the storm sewer network to function under both normal and high-water conditions. Landscape architecture services were integrated into the overall site plan, supporting the design of walkways, seating areas, and streetscape elements that enhance community use while contributing to flood protection.

Stormwater and Flood Control Improvements
The project introduced new storm sewers that direct runoff and floodwaters to outfalls along Sodus Bay. Under normal conditions, water passes through catch basins, pre-treatment structures, and storm sewers before reaching the bay. During flood events, gravity outfalls are closed, and pumping systems convey water to the bay, ensuring continued functionality.

Community and Environmental Benefits
The improvements reduce flood risks, protect public infrastructure, and sustain access during periods of high water. Green infrastructure elements — such as sumps and erosion control at outfalls — minimize sediment and debris entering Sodus Bay, improving watershed health. In addition, new sidewalks, crosswalks, and the integrated seatwall enhance pedestrian safety and create a more accessible, resilient public space.

Key Features

  • Funded through NYS Lake Ontario REDI initiative

  • Multidisciplinary services: survey, civil engineering, and landscape architecture

  • Expanded storm sewer system with pump-supported outfalls

  • Integrated flood-protection seatwall, sidewalk, and pedestrian links

  • Green infrastructure for sediment and debris reduction

  • Pavement, curbs, gutters, and grading improvements for drainage control

  • Enhanced pedestrian safety and streetscape connectivity

Construction Completion

Construction Progress

Public Engagement Process

Prior Flooding Conditions

Press Release

Newark, NY, March 11, 2024 – New York Sea Grant has announced a “Great Lakes Resilience Case Studies” video series featuring successful green infrastructure and flood resilience projects in three upstate communities.

Sodus Point is the village with the lowest elevation along Lake Ontario’s southern shoreline. Following the high-water event in 2017, the Village of Sodus Point enlisted New York Sea Grant to facilitate a public engagement process that empowered local officials to identify ways to protect the village from future flooding. In the “Sodus Point’s Flood Resilience: A Case Study in Community Strength” video, Sodus Point Mayor Dave McDowell, resident Laurie Hayden, and Sarah Costich of Costich Engineering, Land Surveying & Landscape Architecture share how installing green infrastructure elements, a larger storm sewer system, flood wall, and sand dune have benefited the village.

Learn more at the Sea Grant Website:
https://seagrant.sunysb.edu/articles/t/on-youtube-upstate-ny-communities-share-resilience-success-stories-in-nysg-video-case-studies-coastal-community-development-program-news

Additional Information

To learn more on this project and to stay up to date on the project status, visit the Village of Sodus Point Website and sign up for the newsletter:
https://soduspoint.info/

Learn more about NYS Lake Ontario REDI projects visit:
https://www.governor.ny.gov/programs/lake-ontario-resiliency-and-economic-development-initiative-redi

Governor Cuomo Announces Ground Breaking:
https://www.governor.ny.gov/news/governor-cuomo-announces-groundbreaking-758-million-resiliency-project-sodus-point

6/9/2021 WA 30 Project Clarifications:
https://soduspoint.info/wp-content/uploads/2021/06/WA-30-Project-Clarifications.pdf

Check back for updates as construction progresses and follow our social media posts for live updates!